A SERVICE OF

logo

11. Attach the ground wire on the Wire Harness (39)
to the indicated hole in the Base (52) with an M4
x 10mm Ground Screw (84).
52
39
Ground Wire
11
84
Hole
10
10. Start two M8 x 15mm Bolts (8) with two M8 Star
Washers (5) into the Uprights (53, 54). Then,
firmly tighten all six M8 x 15mm Bolts used
i
n steps 9 and 10.
W
ith the help of a second person, carefully
lower the Uprights (53, 54) to the floor (see the
upper drawing in step 12).
10
8
5
8
5
54
53