
179
[Check sheet for apportioning result and watt hour meter]
Item Electric amount[kWh] Result MEMO
Total of apportioning electric amount total
Block total of apportioning result
[Check sheet for block chargning]
Check results
Block name
Total charge
Charge
Basic
charge
MEMO
[Check sheet for setting contents check after test run]
Item Contents Check MEMO
1 Division mode setting(Outdoor unit)
2 Division mode setting(Indoor unit)
3 Charge setting(Weekly)
4 Charge setting(Annual)
5 Charge setting(Seasonal)
6 Unit price (Normal)
7 Unit price (Seasonal)
8 Settlement day setting
9 Basic(standard) charge
10 Copy the database -
◆Note◆
・
Confirm the chargning calculation result of the first day after the test run, and check that the settings ar
correct.
・ When the system is changed, be sure to check the calculation result in 10 days from the changed da
or the next day, or on the next calculation day.
・ Be sure to keep the charging test run check sheet (including the document on the setting chang
created by the user) since the check sheet or the database will be the important evidence when
trouble occurs.