A SERVICE OF

logo

14
12
15
12
14
4. Insert two LINEAR BEARINGS (12) into the ends of the RIGHT CARRIAGE
(15), secure the LINEAR BEARINGS with one SNAP RING (14) at each
bearing.
NOTE: Leave the cardboard sleeve in the bottom LINEAR BEARING,
remove the cardboard sleeve from top bearing.
Repeat the procedure on the LEFT CARRIAGE (13).
5. Assemble the CARRIAGES (13 & 15) to the LIFT BAR (16) and as shown.
Make sure the LIFT BAR is inserted completely through both roller bear-
ings located within the CARRIAGE TUBES (B).
16
13
15
B