1. Operational Procedures 6-1
POD Operations
1. Operational Procedures
POD Operation
Follow the procedure below to operate the POD.
1. Installation and wiring
For details, refer to Chapter 3.
2. Connection with devices including a PLC and a temperature controller
For instructions and precautions on wiring between the POD and other devices, refer to the
separate User’s Manual <PLC Connection> (FEH380).
3. POD power-on
• New POD
• Other than the above
When the check screen below and then the next user screen are displayed correctly, go to
step 5.
4. Screen data creation and transfer
• New POD
Refer to “Initial Screen” (page 6-2).
• Other than the above
Refer to Chapter 5, “Data Transference” in User’s Manual <Operation> (FEH375).
5. Operation start
The POD becomes operable with a PLC or a computer connected to it.
* If the POD does not operate normally and shows an error message, eliminate the cause by
referring to Chapter 7.