S200X 25HP & 27HP - 61” Mower Deck
TP 300-7333-02-M2-SP
7/20072
Quick Setup List -
Page Setup Procedure Steps to Perform
3 Uncrating ❏ Remove Crate & Banding.
❏ Loosen Hydraulic Release Valves.
❏ Release Parking Brake and Roll Tractor forward off skid.
❏ Tighten Hydraulic Release Valves.
3 Battery Installation ❏ Install Battery.
4 Tractor Assembly ❏ Assemble the Motion Control Handles.
❏ Assemble the Seat.
5 Roll Bar Assembly ❏ Install the Roll Bar.
6 Check Fluid Levels ❏ Check Engine Oil level.
❏ Check Hydraulic Oil level.
❏ Check Tire Pressure
7 Mower Assembly ❏ Check Blade Bolt Torque.
❏ Install Deck Pusher Bars (72” Models).
❏ Install the Mower Deck (72” Models).
❏ Check & Adjust Deck Lift Rod Timing.
❏ Check & Level Mower Deck.
❏ Check Deck Drive Belt.
12 Lubrication & ❏ Lubricate all grease & oil points.
Fuel Preparation ❏ Add fuel.
❏ Start the Engine.
14 SAFETY CHECKS ❏ Check for LOOSE HARDWARE.
❏ Check all OPERA
TOR CONTROLS.
❏ Perform SAFETY INTERLOCK SYSTEM CHECK
.