
9
PROCEDUREC
Withoutremovingthepumpcover,runtheentireunitat
highRPM.Pulltheoldtubingoutfromoutletportpump.
Installnewtubebyinsertingintoinletport;continue
feedingtube1/4”inatatimeallowingtheroller
assemblytopushtubingthrough.Whentubingishalf
wayaroundtherace,putyourfingerovertheinlethole
ofthetubeandcontinuetofeedtubing1/4”atatime,
thisshouldmakeinstallationeasier.Continueuntil
desiredtubingextensionisobtained.Rununitforabout
oneminute.
WARNING
ANKOPRODUCTS,INC.assumesnoresponsibilityorliabilityforchemicalcompatibilityofour
tubinginspecificapplications.ALWAYSpretesttubinginaccordancewithtubing
manufacture’sspecifications.Tubingthatshowssignsofswelling,embrittlement,orother
deteriorationshouldnotbeused.
ROLLERBRACKETASSEMBLYINSTRUCTIONS