A SERVICE OF

logo

Installation Guide
4
Step 3:
Mount the NJ90 Unit to the Wall or Cubicle Outlet with the screws
provided.
3.2 - Set up the power supply :
Selecting the power scheme and installing it:
See Appendix C: Setting up the Power Supply (p.8).
You can verify the NJ90 Network Jack Installation by checking the
LED’s.
LED Description
(Lan)
•On - The NJ90 is connected to the network and a
link has been established.
•Blinking - Network Activity.
•Off - There is no connection to the network.
(Power)
•On - The NJ90 is receiving power (local or via the
network).
•Off - The NJ90 is not receiving power.