![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/d/10/d10bc927-4ef5-4cb5-a50d-8d023d23fb67/d10bc927-4ef5-4cb5-a50d-8d023d23fb67-bg25.png)
2001 Pontiac Aztek 1-37
Rail Sectioning—Rear
Installation Procedure con’t
13. To create a solid weld with
minimum heat distortion, make 25
mm (1 in.) stitch welds along the
seam with 25 mm (1 in.) gaps
between them. Then go back and
complete the stitch weld.
IMPORTANT: Prior to refinishing,
refer to publication GM4901M-D-01
GM Approved Refinish Materials for
recommended products. Do not
combine paint systems. Refer to
paint manufacturer’s
recommendations.
14. Clean and prepare all welded
surfaces.
15. Apply the following as necessary:
• Anti-corrosion materials
• Sound deadeners
• Sealers
16. Install all related panels and
components.