Kohler K1191-LC Bathroom Aids User Manual


 
2. Roughing In Information
NOTICE: Unless otherwise specified, floor support under the bath must provide for a minimum of 80
lbs./square foot (390 Kg./square meter) loading.
Consult local and national codes for a minimum air gap requirements when installing a spout on the
faucet deck.
Unit requires two (minimum) 40 gal. (151L) water heaters.
Fixture conforms to ANSI Standard Z124.1. All dimensions are nominal.
No change in measurements if connected with drain illustrated.
Cut-Out = See template supplied with unit.
An access panel is required. The recommended dimensions for this access panel are 40” (101.6cm)Wx15
(38.1cm) H. Refer to the roughing-in diagram for suggested access panel location.
Make sure the flooring is in good condition, and offers adequate support for your bath.
1-1/2” O.D.
PUMP/CONTROL ACCESS
132
6(15.2cm)
1-3/8
(3.5cm)
1-3/16
(3cm)
6-3/8
(16.2cm)
7/16(1.1cm)
3-15/16
(10cm)
12-3/16
(31cm)
24
(61cm)
23
(58.4cm)
46
(116.8cm)
72” (182.9cm)
25-3/16
(64cm)
1012493-2-A 6 Kohler Co.