LF1030-INS-LAB-RevB10
17
CLEANING
Regular cleaning is recommended. A soft cloth, dampened with water and a mild NON-ABRASIVE
detergent (household cleaner, soapy water, or hospital grade disinfectant) is all that is needed to
clean your patient lift. Automobile wax or furniture polish will help maintain the nish over a long
period of time.
CAUTION: DO NOT wash under water pressure or steam clean.
CHECKING FOR DAMAGE AND WEAR
It is extremely important to frequently check the areas of the patient lift that are under a great deal
of stress for damage and wear. These areas include slings, spreader bars, spreader bar suspension
and mounting hardware, pump mounting hardware and all pivot points. Inspect for signs of crack-
ing, fraying, deformation, and any loose components
CAUTION: Replace any defective parts immediately, and make certain that the patient lift
is not used until repairs are made. Contact your authorized Lumex dealer for replacement
parts.
CARE OF SLINGS
Lumex slings are washable at 150° F and autoclavable at 185° F for 30 minutes. The head support's
plastic insert should be removed before washing. The slings can be dried by using a dryer on LOW
heat or by hanging.
CAUTION: DO NOT bleach slings!
LF1030 ONLY: INSTALLATION OF 1010S005 HYDRAULIC PUMP
Removal of Existing Pump
1. Follow the instructions in this
section to remove the existing
pump, shown at near right. If
installing pump for the rst time,
proceed to INSTALLATION OF
NEW PUMP.
2. Detach the top of the existing
pump from the upper boom
bracket, as shown at mid-right:
Use two
9
/16" wrenches to remove
the hardware that secures top
of pump to upper boom bracket.
This will free the pump to rotate
downward.
3. Detach the bottom of the existing
pump from the lower mast brack-
et, as shown at far right. Use two
9
/16" wrenches to remove the
hardware that secures bottom of
pump to lower mast bracket. This
will free the pump — take care
that it does not fall.
lower mast
bracket
upper boom
bracket
boom
mast
existing pump
existing pump detach existing pump
from upper boom
detach existing pump
from lower mast