Emerson CAT 200 Sleep Apnea Machine User Manual


 
Emerson Process Management GmbH & Co. OHG 2-1
CAT
Instruction Manual
HAS9xE-IM-ATEX
05/2007
CHAPTER 2
STARTUP
Once the CAT analyzer is installed correctly
and in accordance to the instructions given
in chapter „Installation“ it is prepared for
startup.
Ensure all requirements given
by the clarification sheet for
performing gas analysis within a
ameproof enclosure are consi-
dered BEFORE supplying gases
(see page S-6)!
This sheet gives instructions,
too, for the sequence of supply-
ing gases during process and
analyzer startup .
After all safety aspects are followed and
checked the instrument may be powered and
operated according the instructions given in
the related instrument‘s instruction manual.
POSSIBLE EXPLOSION HAZARD
Ensure all covers, plugs and housing parts are in place and secured
properly before supplying mains and signal voltages!